Mining Equipment - Logistics Solutions in Australia case study hero

Project Logistics Case Study

Mining Equipment - Logistics Solutions in Australia

Mining Industry Logistics solutions for all your requirements in Australia including freight management and storage. Workflow analysis to identify supply chain bottlenecks and remove additional costs from your mining supply chain. Located in Perth, Melbourne, Brisbane and Darwin, our team in Australia can support your logistics needs to keep your operations running smoothly.

  • Project Logistics
  • Industrial

Proof summary

Project at a glance

Industry
Industrial
Services
Project Logistics

Outcomes

Measurable impact

AUD $218K Annual direct cost reduction
AUD $218KAnnual direct cost reduction
1 Consolidated industrial yard
1Consolidated industrial yard
3 Efficiency areas improved
3Efficiency areas improved

Client overview

Mining equipment comes in all shapes and sizes, frequently equipment can be heavy lift and out of gauge. Ensuring equipment is in the right place at the right time at the right cost can be a logistics challenge for suppliers in the industry.

Project overview

Crane Worldwide Logistics analyzed the client’s workflows, yard location, equipment utilization, labor, transportation, and pricing model to identify avoidable cost and process inefficiencies.

Mining Equipment - Logistics Solutions in Australia case study hero

The challenge

Our client supplies heavy lift pipes to the mining industry and the existing operation was ineffective and expensive. The location of the storage of the pipes was in a residential area that was not accessible nor in close proximity to vendors. The solution was costly due to under-utilized equipment, timelines were not met, and labor and yard rental added complexity to the operation.

Mining Equipment - Logistics Solutions in Australia — challenge

Crane’s response

Our solution

Analyzing the client’s workflows, the Crane Worldwide Logistics team in Brisbane recognized immediately that inefficiencies in the supply chain process. Inefficiencies created additional costs that could be reduced by moving the storage location closer to vendors. Swiftly, the team relocated the pipe yard to an industrial area and adjusted the pricing model to associate costs with output. By understanding the workflow of our client, operations could be streamlined to remove unnecessary steps that reduced efficiencies.

Mining Equipment - Logistics Solutions in Australia — solution

What changed

Results & impact

The new yard location provided a reduction in direct costs of AUD$218,000 per annum. By consolidating the activities in the supply chain process through analyzing the available data, efficiencies were created. This included improved material handling, transportation, and labor efficiencies. Crane Worldwide Logistics work in partnership with our clients to understand existing workflows and improve processes to create cost reductions in the mining industry.

Project Logistics

Need support with Project Logistics?

Talk with a Crane Worldwide Logistics expert about a solution built around your requirements.